Course Overview:
This unit of competency specifies the outcomes required to remove non-friable asbestos containing material (ACM).
It includes preparing, containing and removing non-friable ACM, and knowledge of decontamination and disposal requirements.
Site location can be a real workplace or simulated environment that may include domestic or commercial premises, a demolition site, a new worksite or an existing structure being renovated, extended, restored or maintained.
Project sites for removal of non-friable asbestos include construction sites, ships and soils.
The model work health and safety (WHS) regulationsand theCode of Practice: How to safely remove asbestos (2018) requires workers to hold certification for the class of licensed asbestos removal work they will be undertaking. Completion of this unit of competency is certification to undertake non-friable (Class B) removal work.
Occupational licenses are required nationally. This unit is required for all ACM removal workers engaged in the removal of more than ten square metres of non-friable ACM.
Formal Training:
- Both theory and practical training is provided by industry experienced trainers.
Assessment
- Theory assessment (both a knowledge assessment and a calculations assessment are to be completed).
- Practical assessment is conducted.
Course Topics:
Enrolment Options
You can view our upcoming courses and self-enrol OR contact the team to schedule a course date.











